Tampa, FL 33618
ph: 813-299-5556
alt: 813-299-5556
shawn
PROJECT: New Born Baby Room
Scope:
- Remove previous Base trim
- Install Waynes coating
- Install Crown, Base, Shoe, & Chair Rail Molding
- Putty, Caulk, Sand Trim
- Paint trim with 2 coats interior Semi-Gloss
CROWN, BASE, CHAIR MOLDING INSTALL
BEFORE:
Installing Waynes Coating
Progess Pictures shows half way, and cuts around window, electric sockets, and cable sockets
Finished Project
Painting the Base Molding
Note: Various routing tools used to cut out holes for light switches, and plugs.
Finished: Crown, Chair Rail, Base, Shoe Moldings. 2 coats Interior Semi-Gloss
Tampa, FL 33618
ph: 813-299-5556
alt: 813-299-5556
shawn